Three stages, three different pressures. The support is scoped so the contractor gets senior written input exactly where it will hold up: tender, live delivery, and close-out.

01Tender / planning / mobilisation
Pre-Construction

Tender programmes that hold up to scrutiny, drawing and specification review, buildability input, and technical risk visibility before the job is priced and committed.

02Construction phase / project control
Live Project Delivery

Construction programme control, NEC process discipline, technical coordination review, and independent observation while delivery is live and pressured.

03Inspection / snagging / handover
Quality and Close-Out

Independent quality inspection, snagging and defect reporting, and close-out review, giving the contractor a clear, evidence-based record going into handover.

01Tender / planning / mobilisation

Pre-Construction.

Tender programmes that hold up to scrutiny, drawing and specification review, buildability input, and technical risk visibility before the job is priced and committed.

Typical contractor problems
  • 01Tender programme lacks structure, logic, or float.
  • 02Drawings and specification carry gaps, conflicts, or incomplete information.
  • 03Buildability risk is not being surfaced before price.
  • 04Technical risk has no owner at tender stage.
Where Northpoint fits

Northpoint provides independent planning and technical input before tender submission, producing a defensible programme, flagging information gaps, and setting up coordination workflows before site starts.

Type of support
  • Tender programme preparation
  • Tender drawing and specification review
  • Buildability observations
  • Technical risk review
  • BIM / CDE setup where required
Typical outputs
01
Tender programmes (Microsoft Project / Asta)
02
Tender drawing and specification review notes
03
Buildability observation logs
04
Technical risk review comments
05
BEP / CDE setup documentation where required
02Construction phase / project control

Live Project Delivery.

Construction programme control, NEC process discipline, technical coordination review, and independent observation while delivery is live and pressured.

Typical contractor problems
  • 01Construction programme is not being maintained or updated credibly.
  • 02Early warnings and NEC process are slipping.
  • 03Technical information is incomplete, late, or poorly coordinated.
  • 04Delivery issues are emerging faster than internal resource can absorb.
Where Northpoint fits

Northpoint sits alongside the contractor's delivery team, providing independent programme control, NEC process support, and technical review, so visibility of risk is strengthened without replacing internal roles.

Type of support
  • Construction programme and update reviews
  • NEC process review notes
  • Project control observations
  • Technical coordination review
  • Independent support on live delivery issues
Typical outputs
01
Construction programmes and update reviews
02
NEC process review notes and observations
03
Project control observation reports
04
Technical coordination review comments
05
Independent written input on live delivery issues
03Inspection / snagging / handover

Quality and Close-Out.

Independent quality inspection, snagging and defect reporting, and close-out review, giving the contractor a clear, evidence-based record going into handover.

Typical contractor problems
  • 01Quality concerns are surfacing late in delivery.
  • 02Snagging and defect information is informal or inconsistent.
  • 03Close-out is approaching without independent review.
  • 04Post-completion defects are arriving with no structured basis.
Where Northpoint fits

Northpoint provides independent inspection and reporting through close-out, giving the contractor clear, defensible documentation at handover and on any defect issues that follow.

Type of support
  • Quality inspections
  • Snagging reports
  • Defect review reports
  • Independent technical observations
  • Close-out review notes
Typical outputs
01
Snagging inspection reports
02
Quality audit reports
03
Defect review reports
04
Independent technical observation notes
05
Close-out review notes
08Stage-led support

Bring Northpoint in at the stage where it is needed.